← Back to Hampshire

Solar · United Kingdom

Grove Solar Park (Phase 2)

Operator Solar Century · Owner Ministry Of Trade, Industry And Fisheries

Operational11 MWData checked 16 November 2026Source record dated 16 January 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Grove Solar Park (Phase 2) is a 11 MW solar farm on the edge of North Baddesley, Hampshire, United Kingdom. Its planning application (14/01826/FULLS) went to Test Valley on 31 July 2014 and was granted on appeal on 4 September 2015. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 370 energy sites within 40 km for Grove Solar Park (Phase 2)

Members see the sites and incidents around this one, and every record behind them.

SOLAR CENTURY HOLDINGS LIMITED (03570325), active, since 1998. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
11 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Century
Owner
Ministry Of Trade, Industry And Fisheries
Location
Grove Solar Park, Land west of A3057 (Romsey Road), Romsey, Hampshire, SO51 9LH, United Kingdom
Planning authority
Test Valley
Planning application
14/01826/FULLS
Appeal reference
APP/C1760/W/15/3010697
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01826/FULLS, with what the planning evidence pack adds for this site.

Every application in Test Valley · Alerts for applications and incidents near here

  • 31 July 2014 Planning application submitted
  • 24 December 2014 Planning permission refused
  • 23 April 2015 Appeal lodged
  • 4 September 2015 Planning permission granted
  • 4 September 2015 Appeal granted
  • 18 January 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Grove Solar Park (Phase 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Grove Solar Park (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Grove Solar Park (Phase 2); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Grove Solar Park (Phase 2)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2017.
Where is Grove Solar Park (Phase 2)?
On the edge of North Baddesley, Hampshire, United Kingdom (postcode SO51 9LH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).