Battery storage · United Kingdom

Station Road, Crescent Industrial Estate - Battery Storage Facility

Operator PJS One Limited

Awaiting Construction62 MWData checked 16 November 2026Source record dated 30 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Station Road, Crescent Industrial Estate - Battery Storage Facility is a 62 MW battery storage site on the edge of Totton, Hampshire, United Kingdom. Its planning application (25/01182/FULLS) went to Test Valley on 27 May 2025 and was granted on 29 January 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 54 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Station Road, Crescent Industrial Estate - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 91 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire91 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter142 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction145 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
62 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
PJS One Limited
Location
W/O Station Road, Crescent Industrial Estate, Nursling, Southampton, Hampshire, SO16 0YD, United Kingdom
Planning authority
Test Valley
Planning application
25/01182/FULLS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01182/FULLS, with what the planning evidence pack adds for this site.

Every application in Test Valley · Alerts for applications and incidents near here

  • 27 May 2025 Planning application submitted
  • 29 January 2026 Planning permission granted
  • 29 January 2029 Planning permission runs out

None found. The register holds no published incident that names Station Road, Crescent Industrial Estate - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Station Road, Crescent Industrial Estate - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Station Road, Crescent Industrial Estate - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Station Road, Crescent Industrial Estate - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2026.
Where is Station Road, Crescent Industrial Estate - Battery Storage Facility?
On the edge of Totton, Hampshire, United Kingdom (postcode SO16 0YD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).