← Back to Kent

Solar · United Kingdom

South Lees Farm

Operator Solar Century · Owner Ministry Of Trade, Industry And Fisheries

Operational11 MWData checked 16 November 2026Source record dated 17 December 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

South Lees Farm is a 11 MW solar farm 5.3 km south-east of Sheerness, Kent, United Kingdom. Its planning application (SW/13/1202) went to Swale on 4 October 2013 and was granted on 22 January 2014. It has been operating since 22 June 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 472 energy sites within 40 km for South Lees Farm

Members see the sites and incidents around this one, and every record behind them.

SOLAR CENTURY HOLDINGS LIMITED (03570325), active, since 1998. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
11 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Century
Owner
Ministry Of Trade, Industry And Fisheries
Location
Land adjacent South Lees Farm, Lower Road, Minster On Sea, Sheerness, Kent, Kent, ME12 3SW, United Kingdom
Planning authority
Swale
Planning application
SW/13/1202
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SW/13/1202, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 4 October 2013 Planning application submitted
  • 22 January 2014 Planning permission granted
  • 14 February 2014 Construction started
  • 22 June 2014 Operational

None found. The register holds no published incident that names South Lees Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has South Lees Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South Lees Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of South Lees Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2014.
Where is South Lees Farm?
5.3 km south-east of Sheerness, Kent, United Kingdom (postcode ME12 3SW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).