Solar · United Kingdom

Grove Farm (solar)

Operator juwi Renewable Energies · Owner Mvv Energie AG

Operational3.5 MWData checked 16 November 2026Source record dated 28 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Grove Farm (solar) is a 3.5 MW solar farm 13 km north-west of Taunton, Somerset, United Kingdom. Its planning application (41/13/0004) went to Somerset on 3 December 2013 and was granted on 27 February 2014. It has been operating since 24 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 9 other sites and 279 energy sites within 40 km for Grove Farm (solar)

Members see the sites and incidents around this one, and every record behind them.

JUWI RENEWABLE ENERGIES LIMITED (07355222), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
juwi Renewable Energies
Owner
Mvv Energie AG
Location
Grove Farm, Lydeard, St. Lawrence, Somerset, United Kingdom
Planning authority
Somerset
Planning application
41/13/0004
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 41/13/0004, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 3 December 2013 Planning application submitted
  • 27 February 2014 Planning permission granted
  • 5 January 2015 Construction started
  • 24 March 2015 Operational

None found. The register holds no published incident that names Grove Farm (solar). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Grove Farm (solar) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Grove Farm (solar); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Grove Farm (solar)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2015.
Where is Grove Farm (solar)?
13 km north-west of Taunton, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).