← Back to Grampian

Onshore wind · United Kingdom

Greenhill Croft

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Operational4.6 MWData checked 16 November 2026Source record dated 7 January 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Greenhill Croft is a 4.6 MW wind farm 15 km south-west of Fraserburgh, Grampian, United Kingdom. Its planning application (APP/2009/3456) went to Aberdeenshire on 21 October 2009 and was granted on 11 October 2010. It has been operating since 1 March 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 34 other sites and 194 energy sites within 40 km for Greenhill Croft

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
4.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Bonnykelly, New Pitsligo, Fraserburgh, Grampian, Grampian, AB43 6NP, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2009/3456
First operating
2012
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2009/3456, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 21 October 2009 Planning application submitted
  • 11 October 2010 Planning permission granted
  • 1 October 2011 Construction started
  • 1 March 2012 Operational

None found. The register holds no published incident that names Greenhill Croft. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Greenhill Croft had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Greenhill Croft; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Greenhill Croft?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 7 January 2015.
Where is Greenhill Croft?
15 km south-west of Fraserburgh, Grampian, United Kingdom (postcode AB43 6NP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).