Grantham Solar Farm

Operator British Solar Renewables · Owner Owl Investment Bidco Limited

Operational5 MWData checked 16 November 2026Source record dated 16 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Grantham Solar Farm is a 5 MW solar farm 5.5 km north-west of Great Gonerby, Lincolnshire, United Kingdom. Its planning application (S15/0383) went to South Kesteven on 2 April 2015 and was granted on 24 June 2015. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 61 other sites and 437 energy sites within 40 km for Grantham Solar Farm

Members see the sites and incidents around this one, and every record behind them.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables
Owner
Owl Investment Bidco Limited
Location
Land south-east of Pasture Far, Allington Lane, Foston, Grantham, Lincolnshire, NG32 2JR, United Kingdom
Planning authority
South Kesteven
Planning application
S15/0383
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S15/0383, with what the planning evidence pack adds for this site.

Every application in South Kesteven · Alerts for applications and incidents near here

  • 2 April 2015 Planning application submitted
  • 24 June 2015 Planning permission granted
  • 1 October 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Grantham Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Grantham Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Grantham Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Grantham Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 March 2016.
Where is Grantham Solar Farm?
5.5 km north-west of Great Gonerby, Lincolnshire, United Kingdom (postcode NG32 2JR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).