Solar · United Kingdom
Gonerby Moor, Great Gonerby - Solar Farm
Operator Sonnedix
Operational60 MWData checked 16 November 2026Source record dated 13 July 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Gonerby Moor, Great Gonerby - Solar Farm is a 60 MW solar farm on the edge of Great Gonerby, Lincolnshire, United Kingdom. Its planning application (S21/1018) went to South Kesteven on 21 May 2021 and was granted on 3 November 2021. It has been operating since 26 June 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Gonerby Moor, Great Gonerby - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 60 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sonnedix
- Location
- Gonerby Moor Great Gonerby, Lincolnshire, NG31, United Kingdom
- Planning authority
- South Kesteven
- Planning application
- S21/1018
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S21/1018, with what the planning evidence pack adds for this site.
Every application in South Kesteven · Alerts for applications and incidents near here
Timeline
- 21 May 2021 Planning application submitted
- 3 November 2021 Planning permission granted
- 1 May 2025 Construction started
- 26 June 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Gonerby Moor, Great Gonerby - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Gonerby Moor, Great Gonerby - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Gonerby Moor, Great Gonerby - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Gonerby Moor, Great Gonerby - Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
- Where is Gonerby Moor, Great Gonerby - Solar Farm?
- On the edge of Great Gonerby, Lincolnshire, United Kingdom (postcode NG31).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).