← Back to Cumbria

Solar · United Kingdom

Graham Wood

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Abandoned4.9 MWData checked 16 November 2026Source record dated 1 March 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Graham Wood is a 4.9 MW solar farm 10 km south-east of Penrith, Cumbria, United Kingdom. Its planning application (15/0666) went to Westmorland and Furness on 14 August 2015 and was granted on appeal on 25 January 2017. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 9 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 77 energy sites within 40 km for Graham Wood

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land to the South of Graham Wood, Great Strickland, Penrith, Cumbria, CA10 3DU, United Kingdom
Planning authority
Westmorland and Furness
Planning application
15/0666
Appeal reference
APP/H0928/W/16/3147860

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0666, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 14 August 2015 Planning application submitted
  • 29 October 2015 Planning permission refused
  • 26 April 2016 Appeal lodged
  • 25 January 2017 Planning permission granted
  • 25 January 2017 Appeal granted

None found. The register holds no published incident that names Graham Wood. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Graham Wood had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Graham Wood; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Graham Wood?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 1 March 2019.
Where is Graham Wood?
10 km south-east of Penrith, Cumbria, United Kingdom (postcode CA10 3DU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).