Solar · United Kingdom
Weltree Brow
Operator Livos Energy
Appeal Refused5 MWData checked 16 November 2026Source record dated 29 November 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Weltree Brow is a 5 MW solar farm 13 km south-east of Penrith, Cumbria, United Kingdom. Its planning application (15/0668) went to Westmorland and Furness on 17 August 2015 and was refused on appeal on 22 November 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 9 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Weltree Brow changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Livos Energy
- Location
- Land To The South of Willow Tree Brow, Morland, Penrith, Cumbria, CA10 1TW, United Kingdom
- Planning authority
- Westmorland and Furness
- Planning application
- 15/0668
- Appeal reference
- APP/H0928/W/16/3147136
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/0668, with what the planning evidence pack adds for this site.
Every application in Westmorland and Furness · Alerts for applications and incidents near here
Timeline
- 17 August 2015 Planning application submitted
- 17 December 2015 Planning permission refused
- 8 April 2016 Appeal lodged
- 22 November 2016 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Weltree Brow. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Weltree Brow had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Weltree Brow; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Weltree Brow?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2016.