← Back to Cumbria

Solar · United Kingdom

Weltree Brow

Operator Livos Energy

Appeal Refused5 MWData checked 16 November 2026Source record dated 29 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Weltree Brow is a 5 MW solar farm 13 km south-east of Penrith, Cumbria, United Kingdom. Its planning application (15/0668) went to Westmorland and Furness on 17 August 2015 and was refused on appeal on 22 November 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 9 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 72 energy sites within 40 km for Weltree Brow

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Livos Energy
Location
Land To The South of Willow Tree Brow, Morland, Penrith, Cumbria, CA10 1TW, United Kingdom
Planning authority
Westmorland and Furness
Planning application
15/0668
Appeal reference
APP/H0928/W/16/3147136

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0668, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 17 August 2015 Planning application submitted
  • 17 December 2015 Planning permission refused
  • 8 April 2016 Appeal lodged
  • 22 November 2016 Appeal refused

None found. The register holds no published incident that names Weltree Brow. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Weltree Brow had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Weltree Brow; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Weltree Brow?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2016.
Where is Weltree Brow?
13 km south-east of Penrith, Cumbria, United Kingdom (postcode CA10 1TW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).