← Back to Grampian

Onshore wind · United Kingdom

Gordonstown Hill Wind Farm

Operator Ventient (formerly Infinis)

Operational12.5 MWData checked 16 November 2026Source record dated 4 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gordonstown Hill Wind Farm is a 12.5 MW wind farm 8.6 km south of Turriff, Grampian, United Kingdom. Its planning application (APP/2008/4244) went to Aberdeenshire on 24 December 2008 and was granted on 2 July 2009. It has been operating since 31 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 278 energy sites within 40 km for Gordonstown Hill Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 1,051 MWh, running 76% of half hours, peak 6 MW of 13, load factor 12%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £5,737 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
12.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Ventient (formerly Infinis)
Location
Gordonstown Hill Kirkton Of Auchterless, Turiff, Grampian, AB53 8BG, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2008/4244
First operating
2013
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2008/4244, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 24 December 2008 Planning application submitted
  • 2 July 2009 Planning permission granted
  • 23 July 2012 Construction started
  • 31 March 2013 Operational

None found. The register holds no published incident that names Gordonstown Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gordonstown Hill Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gordonstown Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Gordonstown Hill Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2013.
Where is Gordonstown Hill Wind Farm?
8.6 km south of Turriff, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).