Onshore wind · United Kingdom
Floors Farm Wind Turbines
Operator artine Partnership Ltd
Application Refused6.9 MWData checked 16 November 2026Source record dated 1 July 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Floors Farm Wind Turbines is a 6.9 MW wind farm 9.3 km south-west of Turriff, Grampian, United Kingdom. Its planning application (APP/2012/3956) went to Aberdeenshire on 30 November 2012 and was refused on 26 May 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 27 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Floors Farm Wind Turbines changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 6.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- artine Partnership Ltd
- Location
- Floors FarmAuchterless Fortrie Turriff AB53 4HP, Grampian, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2012/3956
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2012/3956, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 30 November 2012 Planning application submitted
- 26 May 2015 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Floors Farm Wind Turbines. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Floors Farm Wind Turbines had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Floors Farm Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Floors Farm Wind Turbines?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2015.
- Where is Floors Farm Wind Turbines?
- 9.3 km south-west of Turriff, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).