Solar · United Kingdom
Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System
Operator J & M Baxter
Awaiting Construction1 MWData checked 16 November 2026Source record dated 31 March 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System is a 1 MW solar farm 6.3 km north-west of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (21/0329/FUL) went to Dumfries and Galloway on 21 January 2021 and was granted on 28 April 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 158 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 158 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 164 km | Minor |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 188 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- J & M Baxter
- Location
- Glenhead Of Aldouran Leswalt Stranraer, Dumfries and Galloway, DG9 0RJ, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 21/0329/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/0329/FUL, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 21 January 2021 Planning application submitted
- 28 April 2021 Planning permission granted
- 28 April 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2021.
- Where is Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System?
- 6.3 km north-west of Stranraer, Dumfries and Galloway, United Kingdom (postcode DG9 0RJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).