Battery storage · United Kingdom
Knocknain Farm, Leswalt - Battery Storage Unit
Operator Knocknain Developments Limited
Awaiting Construction2 MWData checked 16 November 2026Source record dated 26 September 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Knocknain Farm, Leswalt - Battery Storage Unit is a 2 MW battery storage site 9.3 km west of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (23/0887/FUL) went to Dumfries and Galloway on 23 May 2023 and was granted on 21 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Knocknain Farm, Leswalt - Battery Storage Unit changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knocknain Farm, Leswalt - Battery Storage Unit sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 225 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 225 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 332 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 417 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Knocknain Developments Limited
- Location
- Knocknain Farm, Leswalt, Stranraer, Dumfries and Galloway, DG9 0RU, United Kingdom
- Planning authority
- Dumfries and Galloway
- Planning application
- 23/0887/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/0887/FUL, with what the planning evidence pack adds for this site.
Every application in Dumfries and Galloway · Alerts for applications and incidents near here
Timeline
- 23 May 2023 Planning application submitted
- 21 September 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Knocknain Farm, Leswalt - Battery Storage Unit. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Knocknain Farm, Leswalt - Battery Storage Unit had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Knocknain Farm, Leswalt - Battery Storage Unit; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Knocknain Farm, Leswalt - Battery Storage Unit?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 September 2023.
- Where is Knocknain Farm, Leswalt - Battery Storage Unit?
- 9.3 km west of Stranraer, Dumfries and Galloway, United Kingdom (postcode DG9 0RU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).