Planning pack for this site, £295Other options

Battery storage · United Kingdom

Knocknain Farm, Leswalt - Battery Storage Unit

Operator Knocknain Developments Limited

Awaiting Construction2 MWData checked 16 November 2026Source record dated 26 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Knocknain Farm, Leswalt - Battery Storage Unit is a 2 MW battery storage site 9.3 km west of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (23/0887/FUL) went to Dumfries and Galloway on 23 May 2023 and was granted on 21 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knocknain Farm, Leswalt - Battery Storage Unit sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 225 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool225 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells332 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire417 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Knocknain Developments Limited
Location
Knocknain Farm, Leswalt, Stranraer, Dumfries and Galloway, DG9 0RU, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
23/0887/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0887/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 23 May 2023 Planning application submitted
  • 21 September 2023 Planning permission granted

None found. The register holds no published incident that names Knocknain Farm, Leswalt - Battery Storage Unit. If you know of one, report it (confidential reports are anonymised).

Has Knocknain Farm, Leswalt - Battery Storage Unit had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Knocknain Farm, Leswalt - Battery Storage Unit; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Knocknain Farm, Leswalt - Battery Storage Unit?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 September 2023.
Where is Knocknain Farm, Leswalt - Battery Storage Unit?
9.3 km west of Stranraer, Dumfries and Galloway, United Kingdom (postcode DG9 0RU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).