Solar · United Kingdom

Glebe Farm Solar Farm

Operator NextEnergy Capital LLP

Operational32 MWData checked 16 November 2026Source record dated 3 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glebe Farm Solar Farm is a 32 MW solar farm 6.9 km south-west of Pershore, Hereford and Worcester, United Kingdom. Its planning application (15/01323) went to Wychavon on 21 May 2015 and was granted on 21 October 2015. It has been operating since 1 March 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 317 energy sites within 40 km for Glebe Farm Solar Farm

Members see the sites and incidents around this one, and every record behind them.

NEXTENERGY CAPITAL LIMITED (05975223), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
32 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NextEnergy Capital LLP
Location
Glebe Farm, Bourne Road, Defford, Worcester, Hereford and Worcester, WR8 9BT, United Kingdom
Planning authority
Wychavon
Planning application
15/01323
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01323, with what the planning evidence pack adds for this site.

Every application in Wychavon · Alerts for applications and incidents near here

  • 21 May 2015 Planning application submitted
  • 21 October 2015 Planning permission granted
  • 1 June 2020 Construction started
  • 1 March 2021 Operational

None found. The register holds no published incident that names Glebe Farm Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Glebe Farm Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glebe Farm Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glebe Farm Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
Where is Glebe Farm Solar Farm?
6.9 km south-west of Pershore, Hereford and Worcester, United Kingdom (postcode WR8 9BT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).