Planning application · Solar · Wychavon

Glebe Farm Solar Farm

Operational32 MWApplication 15/01323Submitted 21 May 2015Granted 21 October 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
15/01323
Planning authority
Wychavon
County or area
Hereford and Worcester
Nation
England
Technology
Solar
Capacity
32 MW
Status
Operational
Operator or applicant
NextEnergy Capital LLP
Location
Glebe Farm, Bourne Road, Defford, Worcester, WR8 9BT
First operating
2021
  • 21 May 2015 Planning application submitted
  • 21 October 2015 Planning permission granted
  • 1 June 2020 Construction started
  • 1 March 2021 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire42 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries45 kmMajor
EIR-12722022Fire in solar panel distribution board at Birmingham college50 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near WR8 9BT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Wychavon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.