Llanwern Solar Farm & Battery Storage

Operator NextEnergy Capital LLP

OperationalData checked 16 November 2026Source record dated 31 March 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Llanwern Solar Farm & Battery Storage is a battery storage site 5.4 km south-east of Newport, Gwent, United Kingdom. Its planning application (DNS/3213968) went to Welsh Government (NSIP) on 20 February 2018 and was granted on 18 April 2019. It has been operating since 1 March 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 5 other sites and 540 energy sites within 40 km for Llanwern Solar Farm & Battery Storage

Members see the sites and incidents around this one, and every record behind them.

NEXTENERGY CAPITAL LIMITED (05975223), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Operational
Operator or applicant
NextEnergy Capital LLP
Location
Land At Caldicot Levels To South Of Whitson Electricity Substation, Broad Street Common, Nash, Newport, Gwent, NP18 2BE, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3213968
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3213968, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 20 February 2018 Planning application submitted
  • 18 April 2019 Planning permission granted
  • 1 June 2020 Construction started
  • 1 March 2021 Operational

None found. The register holds no published incident that names Llanwern Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Llanwern Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Llanwern Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Llanwern Solar Farm & Battery Storage?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2022.
Where is Llanwern Solar Farm & Battery Storage?
5.4 km south-east of Newport, Gwent, United Kingdom (postcode NP18 2BE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).