Planning pack for this site, £295Other options

Solar · United Kingdom

Gibraltar Road - Solar photovoltaic system

Operator Centrica Business Solutions · Owner Cbs Services Holdings Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 23 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gibraltar Road - Solar photovoltaic system is a 0.4 MW solar farm 5.5 km north of Kingston upon Hull, East Riding of Yorkshire, United Kingdom. Its planning application (23/03427/PAAP) went to Kingston upon Hull, City of on 22 November 2023 and was granted on 19 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 82 other energy sites within 10 km, 43 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

CENTRICA BUSINESS SOLUTIONS UK LIMITED (01874716), active, since 1984. 10 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gibraltar Road - Solar photovoltaic system sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 48 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton48 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster55 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof91 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Centrica Business Solutions
Owner
Cbs Services Holdings Limited
Location
David Lloyd Leisure, Gibraltar Road, Kingston Upon Hull, East Riding of Yorkshire, HU7 3DB, United Kingdom
Planning authority
Kingston upon Hull, City of
Planning application
23/03427/PAAP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03427/PAAP, with what the planning evidence pack adds for this site.

Every application in Kingston upon Hull, City of · Alerts for applications and incidents near here

  • 19 January 2010 Planning permission expired
  • 22 November 2023 Planning application submitted
  • 19 January 2024 Planning permission granted

None found. The register holds no published incident that names Gibraltar Road - Solar photovoltaic system. If you know of one, report it (confidential reports are anonymised).

Has Gibraltar Road - Solar photovoltaic system had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gibraltar Road - Solar photovoltaic system; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gibraltar Road - Solar photovoltaic system?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2024.
Where is Gibraltar Road - Solar photovoltaic system?
5.5 km north of Kingston upon Hull, East Riding of Yorkshire, United Kingdom (postcode HU7 3DB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).