← Back to Derbyshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array

Operator Centrica Business Solutions · Owner Cbs Services Holdings Limited

Awaiting Construction1 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array is a 1 MW solar farm on the edge of Glossop, Derbyshire, United Kingdom. Its planning application (HPK/2023/0442) went to High Peak on 31 October 2023 and was granted on 10 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

CENTRICA BUSINESS SOLUTIONS UK LIMITED (01874716), active, since 1984. 10 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school36 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof39 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Centrica Business Solutions
Owner
Cbs Services Holdings Limited
Location
Carpenter Plc, Dinting Lodge Industrial Estate, Dinting, Glossop, Derbyshire, SK13 6LE, United Kingdom
Planning authority
High Peak
Planning application
HPK/2023/0442

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for HPK/2023/0442, with what the planning evidence pack adds for this site.

Every application in High Peak · Alerts for applications and incidents near here

  • 31 October 2023 Planning application submitted
  • 10 March 2025 Planning permission granted
  • 10 March 2028 Planning permission runs out

None found. The register holds no published incident that names Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Carpenter Plc, Dinting Lodge Industrial Estate - Solar Array?
On the edge of Glossop, Derbyshire, United Kingdom (postcode SK13 6LE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).