Solar · United Kingdom

Gedling Solar Farm

Operator Foresight

Operational5.7 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gedling Solar Farm is a 5.7 MW solar farm on the edge of Gedling, Nottinghamshire, United Kingdom. Its planning application (2012/1335) went to Gedling on 21 November 2012 and was granted on 23 October 2013. It has been operating since 15 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 58 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 598 energy sites within 40 km for Gedling Solar Farm

Members see the sites and incidents around this one, and every record behind them.

FORESIGHT LIMITED (01845521), active, since 1984. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight
Location
Former Gedling Colliery, Arnold Lane, Gedling, Nottinghamshire, Nottinghamshire, NG4 4GZ, United Kingdom
Planning authority
Gedling
Planning application
2012/1335
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2012/1335, with what the planning evidence pack adds for this site.

Every application in Gedling · Alerts for applications and incidents near here

  • 21 November 2012 Planning application submitted
  • 23 October 2013 Planning permission granted
  • 1 August 2014 Construction started
  • 15 March 2015 Operational

None found. The register holds no published incident that names Gedling Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gedling Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gedling Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gedling Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Gedling Solar Farm?
On the edge of Gedling, Nottinghamshire, United Kingdom (postcode NG4 4GZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).