Gedling Solar Farm

Operational5.7 MWChecked 6 October 2026Last changed in the dataset 4 September 2018

Technology
Solar
Capacity
5.7 MW
Status
Operational
Operator or applicant
Foresight
Location
Former Gedling Colliery, Arnold Lane, Gedling, Nottinghamshire, Nottinghamshire, NG4 4GZ, United Kingdom
Planning authority
Gedling
Planning application
2012/1335
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 21 November 2012 Planning application submitted
  • 23 October 2013 Planning permission granted
  • 1 August 2014 Construction started
  • 15 March 2015 Operational

None found. The register holds no published incident that names Gedling Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.