Onshore wind · United Kingdom

Severn Trent Water - Stoke Bardolph Wind Turbine

Operator Severn Trent Water

Operational1.5 MWData checked 16 November 2026Source record dated 17 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Severn Trent Water - Stoke Bardolph Wind Turbine is a 1.5 MW wind farm on the edge of Gedling, Nottinghamshire, United Kingdom. Its planning application (2012/1472) went to Gedling on 12 December 2012 and was granted on 19 September 2013. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 6 other sites and 588 energy sites within 40 km for Severn Trent Water - Stoke Bardolph Wind Turbine

Members see the sites and incidents around this one, and every record behind them.

SEVERN TRENT WATER LIMITED (02366686), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Severn Trent Water
Location
Stoke Lane, Stoke, Bardolph, Nottinghamshire, Nottinghamshire, NG14 5HL, United Kingdom
Planning authority
Gedling
Planning application
2012/1472
First operating
2015
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2012/1472, with what the planning evidence pack adds for this site.

Every application in Gedling · Alerts for applications and incidents near here

  • 12 December 2012 Planning application submitted
  • 19 September 2013 Planning permission granted
  • 15 March 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Severn Trent Water - Stoke Bardolph Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Severn Trent Water - Stoke Bardolph Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Severn Trent Water - Stoke Bardolph Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Severn Trent Water - Stoke Bardolph Wind Turbine?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2015.
Where is Severn Trent Water - Stoke Bardolph Wind Turbine?
On the edge of Gedling, Nottinghamshire, United Kingdom (postcode NG14 5HL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).