Onshore wind · United Kingdom
Severn Trent Water - Stoke Bardolph Wind Turbine
Operator Severn Trent Water
Operational1.5 MWData checked 16 November 2026Source record dated 17 December 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Severn Trent Water - Stoke Bardolph Wind Turbine is a 1.5 MW wind farm on the edge of Gedling, Nottinghamshire, United Kingdom. Its planning application (2012/1472) went to Gedling on 12 December 2012 and was granted on 19 September 2013. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Severn Trent Water - Stoke Bardolph Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SEVERN TRENT WATER LIMITED (02366686), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Severn Trent Water
- Location
- Stoke Lane, Stoke, Bardolph, Nottinghamshire, Nottinghamshire, NG14 5HL, United Kingdom
- Planning authority
- Gedling
- Planning application
- 2012/1472
- First operating
- 2015
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2012/1472, with what the planning evidence pack adds for this site.
Every application in Gedling · Alerts for applications and incidents near here
Timeline
- 12 December 2012 Planning application submitted
- 19 September 2013 Planning permission granted
- 15 March 2015 Construction started
- 15 December 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Severn Trent Water - Stoke Bardolph Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Severn Trent Water - Stoke Bardolph Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Severn Trent Water - Stoke Bardolph Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Severn Trent Water - Stoke Bardolph Wind Turbine?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2015.
- Where is Severn Trent Water - Stoke Bardolph Wind Turbine?
- On the edge of Gedling, Nottinghamshire, United Kingdom (postcode NG14 5HL).