← Back to Grampian
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Fetteresso Wind Farm (Mid Hill 3)

Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As

Awaiting Construction42 MWData checked 16 November 2026Source record dated 19 October 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Fetteresso Wind Farm (Mid Hill 3) is a 42 MW wind farm 8.2 km west of Stonehaven, Grampian, United Kingdom. Its planning application (ECU00001851) went to Scottish Government (S36) on 3 June 2019 and was granted on 21 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 22 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fetteresso Wind Farm (Mid Hill 3) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire22 kmMinor
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth91 kmSignificant
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm109 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
42 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Fetteresso, Stonehaven, Grampian, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001851
Turbines
10, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001851, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 3 June 2019 Planning application submitted
  • 21 September 2022 Planning permission granted
  • 21 September 2028 Planning permission runs out

None found. The register holds no published incident that names Fetteresso Wind Farm (Mid Hill 3). If you know of one, report it (confidential reports are anonymised).

Has Fetteresso Wind Farm (Mid Hill 3) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fetteresso Wind Farm (Mid Hill 3); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Fetteresso Wind Farm (Mid Hill 3)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 October 2022.
Where is Fetteresso Wind Farm (Mid Hill 3)?
8.2 km west of Stonehaven, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).