Planning pack for this site, £295Other options

Solar · United Kingdom

Elvington Water Treatment Works - Solar Photovoltaic Array

Operator Downing Renewable Developments · Owner Downing Group LLP

Awaiting Construction3 MWData checked 16 November 2026Source record dated 20 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Elvington Water Treatment Works - Solar Photovoltaic Array is a 3 MW solar farm 9.8 km west of Pocklington, East Riding of Yorkshire, United Kingdom. Its planning application (24/01238/FULM) went to York on 16 August 2024 and was granted on 29 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

DOWNING RENEWABLE DEVELOPMENTS LLP (OC439748), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elvington Water Treatment Works - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton25 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster50 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof56 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Downing Renewable Developments
Owner
Downing Group LLP
Location
Elvington Water Treatment Works, Kexby Lane, Elvington, York, East Riding of Yorkshire, YO41 4BA, United Kingdom
Planning authority
York
Planning application
24/01238/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01238/FULM, with what the planning evidence pack adds for this site.

Every application in York · Alerts for applications and incidents near here

  • 16 August 2024 Planning application submitted
  • 29 April 2025 Planning permission granted
  • 29 April 2028 Planning permission runs out

None found. The register holds no published incident that names Elvington Water Treatment Works - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Elvington Water Treatment Works - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Elvington Water Treatment Works - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Elvington Water Treatment Works - Solar Photovoltaic Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2025.
Where is Elvington Water Treatment Works - Solar Photovoltaic Array?
9.8 km west of Pocklington, East Riding of Yorkshire, United Kingdom (postcode YO41 4BA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).