Solar · United Kingdom
Elvington Water Treatment Works - Solar Photovoltaic Array
Operator Downing Renewable Developments · Owner Downing Group LLP
Awaiting Construction3 MWData checked 16 November 2026Source record dated 20 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Elvington Water Treatment Works - Solar Photovoltaic Array is a 3 MW solar farm 9.8 km west of Pocklington, East Riding of Yorkshire, United Kingdom. Its planning application (24/01238/FULM) went to York on 16 August 2024 and was granted on 29 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Elvington Water Treatment Works - Solar Photovoltaic Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
DOWNING RENEWABLE DEVELOPMENTS LLP (OC439748), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elvington Water Treatment Works - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 25 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1175 | 2026 | Rooftop solar panel fire guts NHS mental health ward in Malton | 25 km | Significant |
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 50 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 56 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Downing Renewable Developments
- Owner
- Downing Group LLP
- Location
- Elvington Water Treatment Works, Kexby Lane, Elvington, York, East Riding of Yorkshire, YO41 4BA, United Kingdom
- Planning authority
- York
- Planning application
- 24/01238/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/01238/FULM, with what the planning evidence pack adds for this site.
Every application in York · Alerts for applications and incidents near here
Timeline
- 16 August 2024 Planning application submitted
- 29 April 2025 Planning permission granted
- 29 April 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Elvington Water Treatment Works - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Elvington Water Treatment Works - Solar Photovoltaic Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Elvington Water Treatment Works - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Elvington Water Treatment Works - Solar Photovoltaic Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2025.
- Where is Elvington Water Treatment Works - Solar Photovoltaic Array?
- 9.8 km west of Pocklington, East Riding of Yorkshire, United Kingdom (postcode YO41 4BA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).