Loxley Waste Water Treatment Work,Storrs Bridge Lane - Solar Panels

Application Refused0.6 MWChecked 6 October 2026Last changed in the dataset 11 September 2023

Technology
Solar
Capacity
0.6 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Downing Renewable Developments
Location
Water Treatment Works Storrs Bridge Lane, South Yorkshire, S6 6SX, United Kingdom
Planning authority
Sheffield
Planning application
23/01792/LD2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 6 June 2023 Planning application submitted
  • 1 August 2023 Planning permission refused

None found. The register holds no published incident that names Loxley Waste Water Treatment Work,Storrs Bridge Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.