← Back to Angus

Solar · United Kingdom

Drummygar Solar Park

Operator BWE Partnership

Abandoned5 MWData checked 16 November 2026Source record dated 22 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Drummygar Solar Park is a 5 MW solar farm 8.9 km west of Arbroath, Angus, United Kingdom. Its planning application (15/00873/FULL) went to Angus on 21 September 2015 and was granted on 1 December 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 36 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 198 energy sites within 40 km for Drummygar Solar Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
BWE Partnership
Location
Field 275M South of Carmyllie, Arbroath, Angus, DD11 2QS, United Kingdom
Planning authority
Angus
Planning application
15/00873/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00873/FULL, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 21 September 2015 Planning application submitted
  • 1 December 2015 Planning permission granted
  • 1 December 2018 Planning permission expired

None found. The register holds no published incident that names Drummygar Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Drummygar Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Drummygar Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Drummygar Solar Park?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 22 June 2018.
Where is Drummygar Solar Park?
8.9 km west of Arbroath, Angus, United Kingdom (postcode DD11 2QS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).