Onshore wind · United Kingdom
Dusty Drum
Operator A7 Energy
Revised6 MWData checked 16 November 2026Source record dated 1 December 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dusty Drum is a 6 MW wind farm 6.5 km north of Carnoustie, Tayside, United Kingdom. Its planning application (05/01061/FUL) went to Angus on 1 July 2005 and was withdrawn on 19 December 2007. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 32 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Dusty Drum changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
A7 ENERGY LTD (04750632), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dusty Drum sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 31 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 31 km | Minor |
| EIR-0441 | 2025 | Wind turbine collapses at Aviva's Pitheavlis site in Perth | 46 km | Significant |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 88 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- A7 Energy
- Location
- Land At Dusty Drum, Carmyllie, Arbroath, Angus, Tayside, DD11 2QS, United Kingdom
- Planning authority
- Angus
- Planning application
- 05/01061/FUL
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 05/01061/FUL, with what the planning evidence pack adds for this site.
Every application in Angus · Alerts for applications and incidents near here
Timeline
- 1 July 2005 Planning application submitted
- 19 December 2007 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Dusty Drum. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Dusty Drum had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dusty Drum; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Dusty Drum?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 1 December 2011.
- Where is Dusty Drum?
- 6.5 km north of Carnoustie, Tayside, United Kingdom (postcode DD11 2QS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).