← Back to Cheshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels

Operator Bolesworth Estates Company Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 13 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels is a 0.3 MW solar farm 11 km south-east of Chester, Cheshire, United Kingdom. Its planning application (24/02900/P14) went to Cheshire West and Chester on 26 September 2024 and was granted on 18 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 6 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire31 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent39 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bolesworth Estates Company Limited
Location
Unit 3A Drumlan Hall Farm Newton Lane Newton by Tattenhall, Cheshire, CH3 9NE, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
24/02900/P14

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/02900/P14, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 26 September 2024 Planning application submitted
  • 18 November 2024 Planning permission granted

None found. The register holds no published incident that names Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels. If you know of one, report it (confidential reports are anonymised).

Has Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
Where is Drumlan Hall Farm, Newton Lane - Roof Mounted PV Panels?
11 km south-east of Chester, Cheshire, United Kingdom (postcode CH3 9NE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).