High Street - Solar Farm

Operator Anesco Limited & Shell · Owner Quanesco Midco Limited

Awaiting Construction17.6 MWData checked 16 November 2026Source record dated 7 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Street - Solar Farm is a 17.6 MW solar farm 12 km west of Winsford, Cheshire, United Kingdom. Its planning application (21/04362/FUL) went to Cheshire West and Chester on 25 October 2021 and was granted on 11 October 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

QUANESCO MIDCO LIMITED (13412163), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Street - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire31 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent37 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
17.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco Limited & Shell
Owner
Quanesco Midco Limited
Location
S/O High Street, Clotton, Tarporley, Cheshire, CW6, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
21/04362/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/04362/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 25 October 2021 Planning application submitted
  • 11 October 2022 Planning permission granted
  • 11 October 2025 Planning permission expired

None found. The register holds no published incident that names High Street - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has High Street - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Street - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Street - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 August 2026.
Where is High Street - Solar Farm?
12 km west of Winsford, Cheshire, United Kingdom (postcode CW6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).