Onshore wind · United Kingdom
Dorenell Wind Farm (Previously Site A and B Scaut Hill)
Operator EDF Energy Renewables& Infinergy
Operational177 MWData checked 16 November 2026Source record dated 23 July 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dorenell Wind Farm (Previously Site A and B Scaut Hill) is a 177 MW wind farm 35 km south of Elgin, Grampian, United Kingdom. Its planning application (EC00003173) went to Scottish Government (S36) on 7 May 2008 and was granted on 3 January 2012. It has been operating since 15 September 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Dorenell Wind Farm (Previously Site A and B Scaut Hill) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 177 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- EDF Energy Renewables& Infinergy
- Location
- Glenlivet Estate, Dufftown, Speyside, Moray, Grampian, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00003173
- First operating
- 2018
- Turbines
- 59, 126 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00003173, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 7 May 2008 Planning application submitted
- 3 January 2012 Planning permission granted
- 15 August 2016 Construction started
- 15 September 2018 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Dorenell Wind Farm (Previously Site A and B Scaut Hill). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Dorenell Wind Farm (Previously Site A and B Scaut Hill) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dorenell Wind Farm (Previously Site A and B Scaut Hill); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Dorenell Wind Farm (Previously Site A and B Scaut Hill)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 July 2019.
- Where is Dorenell Wind Farm (Previously Site A and B Scaut Hill)?
- 35 km south of Elgin, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).