← Back to Grampian
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Garbet Windfarm - Wind Farm & Storage facility

Operator Energiekontor UK Limited · Owner Energiekontor AG

Under Construction3 MWData checked 16 November 2026Source record dated 8 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Garbet Windfarm - Wind Farm & Storage facility is a 3 MW battery storage site 25 km south-east of Elgin, Grampian, United Kingdom. Its planning application (21/00020/EIA) went to Moray on 11 January 2021 and was granted on appeal on 26 September 2022. Construction started on 1 March 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 4 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Garbet Windfarm - Wind Farm & Storage facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 451 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool451 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells498 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire642 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Energiekontor UK Limited
Owner
Energiekontor AG
Location
Garbet Windfarm Site 5.5km SE/O Dufftown Keith Grampian, Grampian, AB55, United Kingdom
Planning authority
Moray
Planning application
21/00020/EIA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/00020/EIA, with what the planning evidence pack adds for this site.

Every application in Moray · Alerts for applications and incidents near here

  • 11 January 2021 Planning application submitted
  • 26 November 2021 Planning permission granted
  • 1 December 2021 Appeal lodged
  • 26 September 2022 Appeal granted
  • 1 March 2025 Construction started

None found. The register holds no published incident that names Garbet Windfarm - Wind Farm & Storage facility. If you know of one, report it (confidential reports are anonymised).

Has Garbet Windfarm - Wind Farm & Storage facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Garbet Windfarm - Wind Farm & Storage facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Garbet Windfarm - Wind Farm & Storage facility?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2025.
Where is Garbet Windfarm - Wind Farm & Storage facility?
25 km south-east of Elgin, Grampian, United Kingdom (postcode AB55).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).