Onshore wind · United Kingdom

Lairg 2 Wind Farm

Operator Energiekontor UK Limited · Owner Energiekontor AG

Under Construction49.9 MWData checked 16 November 2026Source record dated 17 February 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lairg 2 Wind Farm is a 49.9 MW wind farm 34 km north of Alness, Highland, United Kingdom. Its planning application (21/00849/FUL) went to Highland on 23 February 2021 and was granted on 2 November 2021. Construction started on 1 January 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 14 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lairg 2 Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 135 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm135 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK135 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment135 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Energiekontor UK Limited
Owner
Energiekontor AG
Location
Land 2400M SE Of Cracrail Toroboll Lairg, Highland, IV27, United Kingdom
Planning authority
Highland
Planning application
21/00849/FUL
Turbines
10, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/00849/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 23 February 2021 Planning application submitted
  • 2 November 2021 Planning permission granted
  • 1 January 2025 Construction started

None found. The register holds no published incident that names Lairg 2 Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Lairg 2 Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lairg 2 Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Lairg 2 Wind Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 February 2025.
Where is Lairg 2 Wind Farm?
34 km north of Alness, Highland, United Kingdom (postcode IV27).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).