Onshore wind · United Kingdom

Clashindarroch Wind Farm Extension

Operator Infinergy

Awaiting Construction139 MWData checked 16 November 2026Source record dated 8 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clashindarroch Wind Farm Extension is a 139 MW wind farm 36 km south of Buckie, Moray, United Kingdom. Its planning application (ECU00004695) went to Scottish Government (S36) on 13 January 2023 and was granted on 18 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

INFINERGY ADVANCED ASSETS LIMITED (13913594), active, since 2022. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clashindarroch Wind Farm Extension sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire73 kmMinor
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm93 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK93 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
139 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinergy
Location
Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie, Moray, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004695
Turbines
21, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004695, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 13 January 2023 Planning application submitted
  • 18 December 2025 Planning permission granted
  • 18 December 2030 Planning permission runs out

None found. The register holds no published incident that names Clashindarroch Wind Farm Extension. If you know of one, report it (confidential reports are anonymised).

Has Clashindarroch Wind Farm Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clashindarroch Wind Farm Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Clashindarroch Wind Farm Extension?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 January 2026.
Where is Clashindarroch Wind Farm Extension?
36 km south of Buckie, Moray, United Kingdom.