Solar · United Kingdom
Deep Moor Landfill Site
Operator Coastal Recycling UK (formerly Devon Waste Management)
Operational2 MWData checked 16 November 2026Source record dated 26 June 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Deep Moor Landfill Site is a 2 MW solar farm 3.8 km north-east of Great Torrington, Devon, United Kingdom. Its planning application (DCC/3848/2016) went to Torridge on 9 March 2016 and was granted on 2 February 2017. It has been operating since 20 April 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Deep Moor Landfill Site changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Coastal Recycling UK (formerly Devon Waste Management)
- Location
- Deep Moor Landfill Site, High Bullen, Devon Waste Management Ltd, Torrington, Devon, EX38 7JA, United Kingdom
- Planning authority
- Torridge
- Planning application
- DCC/3848/2016
- First operating
- 2018
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DCC/3848/2016, with what the planning evidence pack adds for this site.
Every application in Torridge · Alerts for applications and incidents near here
Timeline
- 9 March 2016 Planning application submitted
- 2 February 2017 Planning permission granted
- 15 March 2018 Construction started
- 20 April 2018 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Deep Moor Landfill Site. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Deep Moor Landfill Site had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Deep Moor Landfill Site; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Deep Moor Landfill Site?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 June 2018.
- Where is Deep Moor Landfill Site?
- 3.8 km north-east of Great Torrington, Devon, United Kingdom (postcode EX38 7JA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).