← Back to Devon
Planning pack for this site, £295Other options

Solar · United Kingdom

Deep Moor Waste Management Facility - Solar Park

Operator Devon Waste Management

Revised3 MWData checked 16 November 2026Source record dated 7 July 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Deep Moor Waste Management Facility - Solar Park is a 3 MW solar farm 3.8 km north-east of Great Torrington, Devon, United Kingdom. Its planning application (DCC/3664/2014) went to Torridge on 19 May 2014 and was withdrawn on 21 December 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 25 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Deep Moor Waste Management Facility - Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop34 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control51 kmSignificant
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage61 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Devon Waste Management
Location
Devon Waste Management Ltd, Deepmoor Landfill Site, High Bullen, Torrington, Devon, EX38 7JA, United Kingdom
Planning authority
Torridge
Planning application
DCC/3664/2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DCC/3664/2014, with what the planning evidence pack adds for this site.

Every application in Torridge · Alerts for applications and incidents near here

  • 19 May 2014 Planning application submitted
  • 21 December 2015 Application withdrawn

None found. The register holds no published incident that names Deep Moor Waste Management Facility - Solar Park. If you know of one, report it (confidential reports are anonymised).

Has Deep Moor Waste Management Facility - Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Deep Moor Waste Management Facility - Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Deep Moor Waste Management Facility - Solar Park?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 7 July 2014.
Where is Deep Moor Waste Management Facility - Solar Park?
3.8 km north-east of Great Torrington, Devon, United Kingdom (postcode EX38 7JA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).