Planning application · Solar · Torridge

Deep Moor Landfill Site

Operational2 MWApplication DCC/3848/2016Submitted 9 March 2016Granted 2 February 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DCC/3848/2016
Planning authority
Torridge
County or area
Devon
Nation
England
Technology
Solar
Capacity
2 MW
Status
Operational
Operator or applicant
Coastal Recycling UK (formerly Devon Waste Management)
Location
Deep Moor Landfill Site, High Bullen, Devon Waste Management Ltd, Torrington, EX38 7JA
First operating
2018
  • 9 March 2016 Planning application submitted
  • 2 February 2017 Planning permission granted
  • 15 March 2018 Construction started
  • 20 April 2018 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop34 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control51 kmSignificant
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage61 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near EX38 7JA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Torridge.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.