Onshore wind · United Kingdom

Dalswinton

Operator Airtricity Scotland

Operational30 MWData checked 16 November 2026Source record dated 25 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dalswinton is a 30 MW wind farm 9.9 km north-west of Locharbriggs, Dumfries and Galloway, United Kingdom. Its planning application (03P30610) went to Dumfries and Galloway on 13 October 2003 and was granted on 20 January 2005. It has been operating since 15 March 2008. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

192 energy sites within 40 km for Dalswinton

Members see the sites and incidents around this one, and every record behind them.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 5 Nov: 2,030 MWh, running 76% of half hours, peak 12 MW of 30, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £9,389 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Airtricity Scotland
Location
Nr village of DalswintonDumfries, Dumfries and Galloway, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
03P30610
First operating
2008
Turbines
15

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 03P30610, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 13 October 2003 Planning application submitted
  • 20 January 2005 Planning permission granted
  • 1 April 2007 Construction started
  • 15 March 2008 Operational

None found. The register holds no published incident that names Dalswinton. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dalswinton had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dalswinton; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Dalswinton?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2014.
Where is Dalswinton?
9.9 km north-west of Locharbriggs, Dumfries and Galloway, United Kingdom.