Solar · United Kingdom

Lochar Industrial Estate - Solar Panels & Battery Storage

Operator A&G King Timber Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 25 February 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lochar Industrial Estate - Solar Panels & Battery Storage is a 0.2 MW solar farm in Locharbriggs, Dumfries and Galloway, United Kingdom. Its planning application (24/2250/FUL) went to Dumfries and Galloway on 5 November 2024 and was granted on 30 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lochar Industrial Estate - Solar Panels & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 194 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool194 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells272 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire392 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
A&G King Timber Limited
Location
Lochar Industrial Estate, Dumfries and Galloway, DG1 3PJ, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
24/2250/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/2250/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 5 November 2024 Planning application submitted
  • 30 January 2025 Planning permission granted
  • 30 January 2028 Planning permission runs out

None found. The register holds no published incident that names Lochar Industrial Estate - Solar Panels & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Lochar Industrial Estate - Solar Panels & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lochar Industrial Estate - Solar Panels & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lochar Industrial Estate - Solar Panels & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 February 2025.
Where is Lochar Industrial Estate - Solar Panels & Battery Storage?
In Locharbriggs, Dumfries and Galloway, United Kingdom (postcode DG1 3PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).