← Back to Gwent

Solar · United Kingdom

Cwrt Henllys Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 30 June 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cwrt Henllys Farm is a 5 MW solar farm on the edge of Risca, Gwent, United Kingdom. Its planning application (15/P/00434) went to Torfaen on 22 July 2015 and was granted on 16 June 2016. It has been operating since 29 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 478 energy sites within 40 km for Cwrt Henllys Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Church Farm, Cwm Lane, Henllys, Cwmbran, Gwent, NP44 7AS, United Kingdom
Planning authority
Torfaen
Planning application
15/P/00434
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/P/00434, with what the planning evidence pack adds for this site.

Every application in Torfaen · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 16 June 2016 Planning permission granted
  • 29 October 2016 Construction started
  • 29 December 2016 Operational

None found. The register holds no published incident that names Cwrt Henllys Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cwrt Henllys Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cwrt Henllys Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cwrt Henllys Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2017.
Where is Cwrt Henllys Farm?
On the edge of Risca, Gwent, United Kingdom (postcode NP44 7AS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).