Onshore wind · United Kingdom

Crown Hill Wind Farm

Operator Crown Hill Wind Farm Limited

Application Withdrawn10 MWData checked 16 November 2026Source record dated 2 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crown Hill Wind Farm is a 10 MW wind farm 3.9 km south of Melton Mowbray, Leicestershire, United Kingdom. Its planning application (14/00397/FUL) went to Melton on 12 May 2014 and was withdrawn on 1 October 2015. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 21 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

489 energy sites within 40 km for Crown Hill Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Crown Hill Wind Farm Limited
Location
Fields OS 8300 0006 And 3400Dalby RoadMelton Mowbray, Leicestershire, United Kingdom
Planning authority
Melton
Planning application
14/00397/FUL
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00397/FUL, with what the planning evidence pack adds for this site.

Every application in Melton · Alerts for applications and incidents near here

  • 12 May 2014 Planning application submitted
  • 1 October 2015 Application withdrawn

None found. The register holds no published incident that names Crown Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Crown Hill Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crown Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Crown Hill Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2015.
Where is Crown Hill Wind Farm?
3.9 km south of Melton Mowbray, Leicestershire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).