Onshore wind · United Kingdom
Hall Farm, Klondyke Lane - Wind Turbines
Operator Private Developer
Application Submitted0.2 MWData checked 16 November 2026Source record dated 5 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hall Farm, Klondyke Lane - Wind Turbines is a 0.2 MW wind farm 7.1 km south of Melton Mowbray, Leicestershire, United Kingdom. Its planning application (26/00396/FUL) went to Melton on 6 May 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 20 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hall Farm, Klondyke Lane - Wind Turbines changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hall Farm, Klondyke Lane - Wind Turbines sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2021, Wind turbine catches fire near Thorney in Lincolnshire, 55 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2021 | 2022 | Wind turbine catches fire near Thorney in Lincolnshire | 55 km | Significant |
| EIR-1578 | 2024 | Wind turbine fire near Chumleigh in Devon | 68 km | Significant |
| EIR-1275 | 2022 | Fire damages Siemens Gamesa turbine at French Farm wind farm | 69 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Private Developer
- Location
- Hall Farm, Wind Turbine Klondyke Lane, Thorpe Satchville, Leicestershire, LE14 2TB, United Kingdom
- Planning authority
- Melton
- Planning application
- 26/00396/FUL
- Turbines
- 1, 46.5 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 26/00396/FUL, with what the planning evidence pack adds for this site.
Every application in Melton · Alerts for applications and incidents near here
Timeline
- 6 May 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Hall Farm, Klondyke Lane - Wind Turbines. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hall Farm, Klondyke Lane - Wind Turbines had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hall Farm, Klondyke Lane - Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hall Farm, Klondyke Lane - Wind Turbines?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 June 2026.
- Where is Hall Farm, Klondyke Lane - Wind Turbines?
- 7.1 km south of Melton Mowbray, Leicestershire, United Kingdom (postcode LE14 2TB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).