Onshore wind · United Kingdom
Cross Moor
Operator Devon Light and Power
Application Refused4 MWData checked 16 November 2026Source record dated 25 June 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cross Moor is a 4 MW wind farm 9.8 km east of South Molton, Devon, United Kingdom. Its planning application (43580) went to North Devon on 22 December 2006 and was refused on 16 March 2012. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 4 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cross Moor changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Devon Light and Power
- Location
- LAND AT CROSS MOOR KNOWSTONE SOUTH MOLTON EX363PT, Devon, United Kingdom
- Planning authority
- North Devon
- Planning application
- 43580
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 43580, with what the planning evidence pack adds for this site.
Every application in North Devon · Alerts for applications and incidents near here
Timeline
- 22 December 2006 Planning application submitted
- 16 March 2012 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Cross Moor. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cross Moor had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cross Moor; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cross Moor?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 June 2012.
- Where is Cross Moor?
- 9.8 km east of South Molton, Devon, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).