Onshore wind · United Kingdom

Batsworthy Cross

Operator Blackrock Real Assets

Operational18 MWData checked 16 November 2026Source record dated 30 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Batsworthy Cross is a 18 MW wind farm 11 km south-east of South Molton, Devon, United Kingdom. Its planning application (43272) went to North Devon on 18 November 2006 and was granted on appeal on 22 October 2012. It has been operating since 7 April 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

249 energy sites within 40 km for Batsworthy Cross

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Blackrock Real Assets
Location
Batsworthy Cross, Creacombe, North Devon, Devon, United Kingdom
Planning authority
North Devon
Planning application
43272
Appeal reference
A/11/2162070/NWF
First operating
2016
Turbines
9, 103 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 43272, with what the planning evidence pack adds for this site.

Every application in North Devon · Alerts for applications and incidents near here

  • 18 November 2006 Planning application submitted
  • 20 July 2011 Planning permission refused
  • 22 October 2012 Planning permission granted
  • 22 October 2012 Appeal granted
  • 18 January 2016 Construction started
  • 7 April 2016 Operational

None found. The register holds no published incident that names Batsworthy Cross. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Batsworthy Cross had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Batsworthy Cross; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Batsworthy Cross?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 November 2016.
Where is Batsworthy Cross?
11 km south-east of South Molton, Devon, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).