Solar · United Kingdom
Bommertown Solar Farm
Operator Steadfast Molland Solar Ltd
Operational5 MWData checked 16 November 2026Source record dated 28 July 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bommertown Solar Farm is a 5 MW solar farm 10 km east of South Molton, Devon, United Kingdom. Its planning application (54402) went to North Devon on 30 July 2012 and was granted on appeal on 5 August 2014. It has been operating since 16 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bommertown Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Steadfast Molland Solar Ltd
- Location
- Bommertown Farm, Bottreaux Mill, South Molton, Devon, EX36 3PS, United Kingdom
- Planning authority
- North Devon
- Planning application
- 54402
- Appeal reference
- APP/X1118/A/14/2211328
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 54402, with what the planning evidence pack adds for this site.
Every application in North Devon · Alerts for applications and incidents near here
Timeline
- 30 July 2012 Planning application submitted
- 23 October 2013 Planning permission refused
- 5 August 2014 Planning permission granted
- 5 August 2014 Appeal granted
- 16 December 2015 Operational
- 6 February 2016 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Bommertown Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bommertown Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bommertown Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bommertown Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2016.
- Where is Bommertown Solar Farm?
- 10 km east of South Molton, Devon, United Kingdom (postcode EX36 3PS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).