Solar · United Kingdom

Cooles Farm, Minety - Solar Park/Battery Storage

Operator Ecotricity Generation Limited

Application Submitted8 MWData checked 16 November 2026Source record dated 6 December 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cooles Farm, Minety - Solar Park/Battery Storage is a 8 MW solar farm 9.3 km south of Cirencester, Wiltshire, United Kingdom. Its planning application (PL/2022/08634) went to Wiltshire on 7 November 2022. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 56 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ECOTRICITY GENERATION LIMITED (03117225), active, since 1995. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cooles Farm, Minety - Solar Park/Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 9.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire9.4 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter145 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction166 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Ecotricity Generation Limited
Location
Cooles Farm, Minety, Wiltshire, SN16 9QA, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2022/08634

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2022/08634, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 7 November 2022 Planning application submitted

None found. The register holds no published incident that names Cooles Farm, Minety - Solar Park/Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Cooles Farm, Minety - Solar Park/Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cooles Farm, Minety - Solar Park/Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cooles Farm, Minety - Solar Park/Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 6 December 2022.
Where is Cooles Farm, Minety - Solar Park/Battery Storage?
9.3 km south of Cirencester, Wiltshire, United Kingdom (postcode SN16 9QA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).