← Back to Wiltshire

Battery storage · United Kingdom

Minety South 2 - Battery Storage Facility

Operator Statera Energy · Owner HB411MIN Ltd

Operational50 MWData checked 16 November 2026Source record dated 9 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Minety South 2 - Battery Storage Facility is a 50 MW battery storage site 7.5 km north-east of Malmesbury, Wiltshire, United Kingdom. Its planning application (PL/2021/04151) went to Wiltshire on 22 March 2021 and was granted on 8 November 2021. It has been operating since 7 November 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 30 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 12 other sites and 432 energy sites within 40 km for Minety South 2 - Battery Storage Facility

Members see the sites and incidents around this one, and every record behind them.

STATERA ENERGY LIMITED (09840486), active, since 2015. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Statera Energy
Owner
HB411MIN Ltd
Location
Purlieus Farm, Minety, Malmesbury, Wiltshire, SN16 9RP, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2021/04151
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2021/04151, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 22 March 2021 Planning application submitted
  • 8 November 2021 Planning permission granted
  • 7 November 2022 Operational

None found. The register holds no published incident that names Minety South 2 - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Minety South 2 - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Minety South 2 - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Minety South 2 - Battery Storage Facility?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 March 2026.
Where is Minety South 2 - Battery Storage Facility?
7.5 km north-east of Malmesbury, Wiltshire, United Kingdom (postcode SN16 9RP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).