← Back to Wiltshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems)

Operator Pelagic Energy · Owner HB222BRI Ltd

Revised47.5 MWData checked 16 November 2026Source record dated 28 January 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems) is a 47.5 MW battery storage site 8.8 km east of Malmesbury, Wiltshire, United Kingdom. Its planning application (PL/2022/00404) went to Wiltshire on 17 January 2022 and was withdrawn on 29 June 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 53 other energy sites within 10 km, 30 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

PELAGIC ENERGY LTD (11222504), active, since 2018. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire12 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter143 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction166 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
47.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Pelagic Energy
Owner
HB222BRI Ltd
Location
Dog Trap Lane, Minety, Malmesbury, Wiltshire, SN16 9PW, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2022/00404

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2022/00404, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 17 January 2022 Planning application submitted
  • 29 June 2022 Application withdrawn

None found. The register holds no published incident that names Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems). If you know of one, report it (confidential reports are anonymised).

Has Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems)?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 28 January 2022.
Where is Land At Fairholme Battery Storage (Dog Trap Lane, Minety - Battery Energy Storage Systems)?
8.8 km east of Malmesbury, Wiltshire, United Kingdom (postcode SN16 9PW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).