Solar · United Kingdom

Chelveston Renewable Energy Park - Solar Extension

Operator FEL Solar

Operational19.5 MWData checked 16 November 2026Source record dated 29 June 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chelveston Renewable Energy Park - Solar Extension is a 19.5 MW solar farm 4.4 km east of Higham Ferrers, Northamptonshire, United Kingdom. Its planning application (14/01777/FUL) went to North Northamptonshire on 23 June 2014 and was granted on 17 October 2014. It has been operating since 20 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

523 energy sites within 40 km for Chelveston Renewable Energy Park - Solar Extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
19.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
FEL Solar
Location
Chelveston Renewable Energy Park, Chelveston Airfield, Chelveston, Northamptonshire, NN9 6AR, United Kingdom
Planning authority
North Northamptonshire
Planning application
14/01777/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01777/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 23 June 2014 Planning application submitted
  • 17 October 2014 Planning permission granted
  • 15 November 2014 Construction started
  • 20 March 2015 Operational

None found. The register holds no published incident that names Chelveston Renewable Energy Park - Solar Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chelveston Renewable Energy Park - Solar Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chelveston Renewable Energy Park - Solar Extension; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chelveston Renewable Energy Park - Solar Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2015.
Where is Chelveston Renewable Energy Park - Solar Extension?
4.4 km east of Higham Ferrers, Northamptonshire, United Kingdom (postcode NN9 6AR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).