Chelveston Renewable Energy Park

Operator Federal Estates

Under Construction20 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chelveston Renewable Energy Park is a 20 MW battery storage site 3.8 km south of Raunds, Northamptonshire, United Kingdom. Its planning application (17/00784/FUL) went to North Northamptonshire on 20 April 2017 and was granted on 10 May 2018. Construction started on 1 July 2019. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 33 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chelveston Renewable Energy Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 98 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells98 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction113 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire116 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Federal Estates
Location
Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough, Northamptonshire, NN9 6AR, United Kingdom
Planning authority
North Northamptonshire
Planning application
17/00784/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/00784/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 20 April 2017 Planning application submitted
  • 10 May 2018 Planning permission granted
  • 1 July 2019 Construction started

None found. The register holds no published incident that names Chelveston Renewable Energy Park. If you know of one, report it (confidential reports are anonymised).

Has Chelveston Renewable Energy Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chelveston Renewable Energy Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chelveston Renewable Energy Park?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Chelveston Renewable Energy Park?
3.8 km south of Raunds, Northamptonshire, United Kingdom (postcode NN9 6AR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).