Chelveston Renewable Energy Park

Operator Wykes Engineering

Planning Permission Expired21 MWData checked 16 November 2026Source record dated 19 July 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chelveston Renewable Energy Park is a 21 MW solar farm 4 km east of Higham Ferrers, Northamptonshire, United Kingdom. Its planning application (15/00489/FUL) went to North Northamptonshire on 11 March 2015 and was granted on 30 June 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 21 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

528 energy sites within 40 km for Chelveston Renewable Energy Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
21 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Wykes Engineering
Location
Chelveston Renewable Energy Park, Caldecott, Wellingborough, Northamptonshire, Northamptonshire, NN9 6AR, United Kingdom
Planning authority
North Northamptonshire
Planning application
15/00489/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00489/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 11 March 2015 Planning application submitted
  • 30 June 2015 Planning permission granted
  • 30 June 2018 Planning permission expired

None found. The register holds no published incident that names Chelveston Renewable Energy Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chelveston Renewable Energy Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chelveston Renewable Energy Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chelveston Renewable Energy Park?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 19 July 2018.
Where is Chelveston Renewable Energy Park?
4 km east of Higham Ferrers, Northamptonshire, United Kingdom (postcode NN9 6AR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).