Onshore wind · United Kingdom

Chelker Reservoir (Retention of Turbines)

Operator Yorkshire Water · Owner Kelda Group Limited

Operational1.2 MWData checked 16 November 2026Source record dated 2 December 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chelker Reservoir (Retention of Turbines) is a 1.2 MW wind farm 5.6 km north of Silsden, North Yorkshire, United Kingdom. Its planning application (24/2001/0997) went to North Yorkshire on 24 January 2001 and was granted on 30 May 2001. It has been operating since 1 May 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 7 other sites and 330 energy sites within 40 km for Chelker Reservoir (Retention of Turbines)

Members see the sites and incidents around this one, and every record behind them.

YORKSHIRE WATER LIMITED (03778498), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Yorkshire Water
Owner
Kelda Group Limited
Location
Land adjacent to Chelker Reservoir, nr Skipton, North Yorkshire, United Kingdom
Planning authority
North Yorkshire
Planning application
24/2001/0997
First operating
2004
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/2001/0997, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 24 January 2001 Planning application submitted
  • 30 May 2001 Planning permission granted
  • 1 May 2004 Operational

None found. The register holds no published incident that names Chelker Reservoir (Retention of Turbines). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chelker Reservoir (Retention of Turbines) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chelker Reservoir (Retention of Turbines); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Chelker Reservoir (Retention of Turbines)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2011.
Where is Chelker Reservoir (Retention of Turbines)?
5.6 km north of Silsden, North Yorkshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).