Chelker Reservoir Repower is a 3.9 MW wind farm 5.6 km north of Silsden, North Yorkshire, United Kingdom. Its planning application (24/2011/11383) went to North Yorkshire on 11 February 2011 and was withdrawn on 4 July 2011. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 13 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 4 other sites and 330 energy sites within 40 km for Chelker Reservoir Repower

Members see the sites and incidents around this one, and every record behind them.

KELDA WATER SERVICES LIMITED (02180706), active, since 1987. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
3.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Kelda Water Services
Owner
Kelda Group Limited
Location
Skipton Road, Addingham, Ilkley, LS29 0JU, North Yorkshire, United Kingdom
Planning authority
North Yorkshire
Planning application
24/2011/11383
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/2011/11383, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 11 February 2011 Planning application submitted
  • 4 July 2011 Application withdrawn

None found. The register holds no published incident that names Chelker Reservoir Repower. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chelker Reservoir Repower had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chelker Reservoir Repower; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Chelker Reservoir Repower?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2011.
Where is Chelker Reservoir Repower?
5.6 km north of Silsden, North Yorkshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).